Traveltalkonline.com Forums

.


SXM Cruise Schedule TTOL Sponsors SXM Travel Calendar
Forum Statistics
Forums39
Topics40,032
Posts324,932
Members26,769
Most Online4,031
Dec 15th, 2024
Top Posters(30 Days)
RonDon 60
kim 31
jazzgal 27
Kennys 24
Manpot 24
Member Spotlight
KimberlySea
KimberlySea
Great Meadows, New Jersey
Posts: 147
Joined: October 2003
Today's Birthdays
birdeesan
Who's Online Now
1 members (1 invisible), 950 guests, and 37 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#321219 06/15/2024 08:54 PM
Joined: Mar 2009
Posts: 19,869
Likes: 26
Traveler
OP Offline
Traveler
Joined: Mar 2009
Posts: 19,869
Likes: 26
St. Maarten- Expect your power to be off from 10 pm today until 12 midday Sunday.

PRESS RELEASE
Saturday, June 15, 2024

For Immediate Release

NV GEBE Power Plant Scheduled Maintenance on Diesel Generator (DG) Set #18
Philipsburg, St. Maarten – June 15th, 2024 – NV GEBE announces a planned corrective maintenance for Diesel Generator (DG) set #18 at the Power Plant. To facilitate this essential maintenance, the respective production unit will be shut down on Saturday, June 15th, 2024, at 10:00 p.m.

This early shutdown is crucial to ensure the engine has adequate time to cool before the scheduled maintenance begins at 4:00 a.m. on Sunday, June 16th, 2024. A minimum downtime of six (6) hours is required to ensure the engine cools sufficiently, allowing the Mechanical Maintenance department to perform the necessary tasks safely and efficiently. The heat from these large engines poses a significant threat to the safety of our employees. By allowing sufficient cooling time, NV GEBE ensures a safer working environment, reducing the risk of heat-related injuries and ensuring our maintenance team can perform their tasks under safe conditions.

Please note that during the maintenance window, load shedding may be necessary to manage the power supply effectively. We ask for your patience and cooperation during this period as we work to minimize any disruptions.
The maintenance work is expected to be completed by approximately 12:00 p.m. on Sunday, June 16th, 2024. We aim to reinstate the unit and resume normal operations at this time.

We apologize for any inconvenience this temporary shutdown may cause and appreciate your understanding as we perform these essential maintenance tasks to ensure the continued reliability and safety of our power generation equipment.

SXM Sponsors
.
Joined: May 2021
Posts: 398
Likes: 16
E
Traveler
Offline
Traveler
E
Joined: May 2021
Posts: 398
Likes: 16
I would be going for lunch on the French side today (well, mostly everyday since I stay on that side).

Good luck to those who are currently on the island.

Joined: Mar 2001
Posts: 18,076
Likes: 17
Traveler
Offline
Traveler
Joined: Mar 2001
Posts: 18,076
Likes: 17
From the GEBE situation to the seemingly never-ending and delayed airport reconstruction, the increasing crime, lack of any timeshare regulation and continued building and overbuilding, the island and those who run and govern it are NOT doing themselves any favors.


J.D.
Joined: Aug 2000
Posts: 84,383
Likes: 23
Traveler
Offline
Traveler
Joined: Aug 2000
Posts: 84,383
Likes: 23
Dunno. Our electric was off from 4 to 6 PM yesterday and has been on since then.


Carol Hill
Joined: Oct 2011
Posts: 802
Likes: 6
L
Traveler
Offline
Traveler
L
Joined: Oct 2011
Posts: 802
Likes: 6
It doesn't say that the power will be off for that amount of time. It says one of the generators will be down. Big difference.
However, I completely agree with rural carrier. SXM needs a big investment in its infrastructure. And by investment, I don't mean paying bribes!

Joined: Mar 2001
Posts: 18,076
Likes: 17
Traveler
Offline
Traveler
Joined: Mar 2001
Posts: 18,076
Likes: 17
Originally Posted by lcote
It doesn't say that the power will be off for that amount of time. It says one of the generators will be down. Big difference.
However, I completely agree with rural carrier. SXM needs a big investment in its infrastructure. And by investment, I don't mean paying bribes!

B-I-N-G-O!

A TIMELY movement on the fronts would be nice also.


J.D.
Joined: Aug 2000
Posts: 84,383
Likes: 23
Traveler
Offline
Traveler
Joined: Aug 2000
Posts: 84,383
Likes: 23
Yesterday's power outage wasn't any different than "normal", 2 to 4:15 PM here yesterday.

We are headed home today and while it's always sad to go home, I'm ready. Once 10 days have passed, I miss my puppies!


Carol Hill
Joined: Oct 2013
Posts: 1,821
Likes: 2
Traveler
Offline
Traveler
Joined: Oct 2013
Posts: 1,821
Likes: 2
Safe travels.


Be Happy! Simply because you deserve to be. 😁
Joined: Aug 2000
Posts: 84,383
Likes: 23
Traveler
Offline
Traveler
Joined: Aug 2000
Posts: 84,383
Likes: 23
Thanks


Carol Hill
Joined: Apr 2011
Posts: 198
G
Traveler
Offline
Traveler
G
Joined: Apr 2011
Posts: 198
Can anyone tell me if SBR Villas have a generator to take the sting out of these power disruptions?
George

Joined: Dec 2004
Posts: 5,166
Likes: 4
Traveler
Offline
Traveler
Joined: Dec 2004
Posts: 5,166
Likes: 4
I have never noticed a power outage so I would say yes....

Edit...from a recent post here:

Quote
Simpson Bay Resort has had a huge bank of generators for many years. Well taken care of there.

Last edited by boucharda; 06/18/2024 04:39 PM.
Joined: Mar 2009
Posts: 19,869
Likes: 26
Traveler
OP Offline
Traveler
Joined: Mar 2009
Posts: 19,869
Likes: 26
Yes they do and quite loud. I've walked by them while they were running.

Joined: Apr 2011
Posts: 198
G
Traveler
Offline
Traveler
G
Joined: Apr 2011
Posts: 198
Thank you both. Sounds good for my Oct. trip.