Traveltalkonline.com Forums


SXM Cruise Schedule TTOL Sponsors SXM Travel Calendar
Forum Statistics
Forums39
Topics39,249
Posts318,241
Members26,644
Most Online3,755
Sep 23rd, 2024
Top Posters(30 Days)
Kennys 42
RonDon 28
bdeeley 24
Colour1 22
dolfer 20
Member Spotlight
SXMScubaman
SXMScubaman
Auburn, WA
Posts: 19,281
Joined: March 2009
Today's Birthdays
There are no members with birthdays on this day.
Who's Online Now
12 members (marybeth, PrairieGirl, WWII, deliveryskipper, JerseyPal, Todd_Melinda_K, 6 invisible), 1,345 guests, and 218 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#321219 06/15/2024 08:54 PM
Joined: Mar 2009
Posts: 19,281
Traveler
OP Offline
Traveler
Joined: Mar 2009
Posts: 19,281
St. Maarten- Expect your power to be off from 10 pm today until 12 midday Sunday.

PRESS RELEASE
Saturday, June 15, 2024

For Immediate Release

NV GEBE Power Plant Scheduled Maintenance on Diesel Generator (DG) Set #18
Philipsburg, St. Maarten – June 15th, 2024 – NV GEBE announces a planned corrective maintenance for Diesel Generator (DG) set #18 at the Power Plant. To facilitate this essential maintenance, the respective production unit will be shut down on Saturday, June 15th, 2024, at 10:00 p.m.

This early shutdown is crucial to ensure the engine has adequate time to cool before the scheduled maintenance begins at 4:00 a.m. on Sunday, June 16th, 2024. A minimum downtime of six (6) hours is required to ensure the engine cools sufficiently, allowing the Mechanical Maintenance department to perform the necessary tasks safely and efficiently. The heat from these large engines poses a significant threat to the safety of our employees. By allowing sufficient cooling time, NV GEBE ensures a safer working environment, reducing the risk of heat-related injuries and ensuring our maintenance team can perform their tasks under safe conditions.

Please note that during the maintenance window, load shedding may be necessary to manage the power supply effectively. We ask for your patience and cooperation during this period as we work to minimize any disruptions.
The maintenance work is expected to be completed by approximately 12:00 p.m. on Sunday, June 16th, 2024. We aim to reinstate the unit and resume normal operations at this time.

We apologize for any inconvenience this temporary shutdown may cause and appreciate your understanding as we perform these essential maintenance tasks to ensure the continued reliability and safety of our power generation equipment.

SXM Sponsors
Joined: May 2021
Posts: 271
Likes: 2
E
Traveler
Offline
Traveler
E
Joined: May 2021
Posts: 271
Likes: 2
I would be going for lunch on the French side today (well, mostly everyday since I stay on that side).

Good luck to those who are currently on the island.

Joined: Mar 2001
Posts: 17,779
Likes: 1
Traveler
Offline
Traveler
Joined: Mar 2001
Posts: 17,779
Likes: 1
From the GEBE situation to the seemingly never-ending and delayed airport reconstruction, the increasing crime, lack of any timeshare regulation and continued building and overbuilding, the island and those who run and govern it are NOT doing themselves any favors.


J.D.
Joined: Aug 2000
Posts: 83,712
Traveler
Offline
Traveler
Joined: Aug 2000
Posts: 83,712
Dunno. Our electric was off from 4 to 6 PM yesterday and has been on since then.


Carol Hill
Joined: Oct 2011
Posts: 747
Likes: 1
L
Traveler
Offline
Traveler
L
Joined: Oct 2011
Posts: 747
Likes: 1
It doesn't say that the power will be off for that amount of time. It says one of the generators will be down. Big difference.
However, I completely agree with rural carrier. SXM needs a big investment in its infrastructure. And by investment, I don't mean paying bribes!

Joined: Mar 2001
Posts: 17,779
Likes: 1
Traveler
Offline
Traveler
Joined: Mar 2001
Posts: 17,779
Likes: 1
Originally Posted by lcote
It doesn't say that the power will be off for that amount of time. It says one of the generators will be down. Big difference.
However, I completely agree with rural carrier. SXM needs a big investment in its infrastructure. And by investment, I don't mean paying bribes!

B-I-N-G-O!

A TIMELY movement on the fronts would be nice also.


J.D.
Joined: Aug 2000
Posts: 83,712
Traveler
Offline
Traveler
Joined: Aug 2000
Posts: 83,712
Yesterday's power outage wasn't any different than "normal", 2 to 4:15 PM here yesterday.

We are headed home today and while it's always sad to go home, I'm ready. Once 10 days have passed, I miss my puppies!


Carol Hill
Joined: Oct 2013
Posts: 1,749
Traveler
Offline
Traveler
Joined: Oct 2013
Posts: 1,749
Safe travels.


Be Happy! Simply because you deserve to be. 😁

[Linked Image]
Joined: Aug 2000
Posts: 83,712
Traveler
Offline
Traveler
Joined: Aug 2000
Posts: 83,712
Thanks


Carol Hill
Joined: Apr 2011
Posts: 197
G
Traveler
Offline
Traveler
G
Joined: Apr 2011
Posts: 197
Can anyone tell me if SBR Villas have a generator to take the sting out of these power disruptions?
George

Joined: Dec 2004
Posts: 5,108
Likes: 1
Traveler
Offline
Traveler
Joined: Dec 2004
Posts: 5,108
Likes: 1
I have never noticed a power outage so I would say yes....

Edit...from a recent post here:

Quote
Simpson Bay Resort has had a huge bank of generators for many years. Well taken care of there.

Last edited by boucharda; 06/18/2024 04:39 PM.
Joined: Mar 2009
Posts: 19,281
Traveler
OP Offline
Traveler
Joined: Mar 2009
Posts: 19,281
Yes they do and quite loud. I've walked by them while they were running.

Joined: Apr 2011
Posts: 197
G
Traveler
Offline
Traveler
G
Joined: Apr 2011
Posts: 197
Thank you both. Sounds good for my Oct. trip.
George