Traveltalkonline.com Forums

.


SXM Cruise Schedule TTOL Sponsors SXM Travel Calendar
Forum Statistics
Forums39
Topics39,621
Posts321,322
Members26,689
Most Online4,031
Dec 15th, 2024
Top Posters(30 Days)
RonDon 59
jazzgal 54
erb923 43
GaKaye 26
Member Spotlight
EdB
EdB
Boynton Beach, FL
Posts: 3,294
Joined: December 2008
Today's Birthdays
2parrotheads, jmayhar, marcel, michael02ken, trista
Who's Online Now
8 members (MrEZgoin, deliveryskipper, Matagorda Dude, BillB42, Whale Tail, SXMScubaman, 2 invisible), 249 guests, and 58 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Oct 2013
Posts: 1,821
Likes: 2
bdeeley Offline OP
Traveler
OP Offline
Traveler
Joined: Oct 2013
Posts: 1,821
Likes: 2
GEBE is well on its way to solving its power generation problems and bringing an end to the load shedding that has been happening on the Dutch side.

Engine #19 was brought back online today adding 10.5 Megawatts back to the grid. Engines 18 & 20 had repairs made in October. The containerized 10MW units were fully operational in August and hopefully the new 20MW container units will be live by the end of November.

After all of this, maybe no more load-shedding.

GEBE - updates link


Be Happy! Simply because you deserve to be. 😁
SXM Sponsors
.
Joined: Mar 2009
Posts: 19,545
Likes: 7
Traveler
Online Content
Traveler
Joined: Mar 2009
Posts: 19,545
Likes: 7
I wouldn't guarentee that's the long term solution. Short term with the way the island is developing.

Joined: Aug 2000
Posts: 84,027
Likes: 5
Traveler
Offline
Traveler
Joined: Aug 2000
Posts: 84,027
Likes: 5
I figure the residents of the island would be happy with a short term solution.


Carol Hill
Joined: Oct 2013
Posts: 1,821
Likes: 2
bdeeley Offline OP
Traveler
OP Offline
Traveler
Joined: Oct 2013
Posts: 1,821
Likes: 2
Carol, this should be the start of a long term solution and once the new 20 megawatt containerized generators are brought online than GEBE will be able to meet peak demand and load shedding should end.


Be Happy! Simply because you deserve to be. 😁
Joined: Aug 2000
Posts: 84,027
Likes: 5
Traveler
Offline
Traveler
Joined: Aug 2000
Posts: 84,027
Likes: 5
One would hope so, but my confidence is not high.


Carol Hill
Joined: Mar 2009
Posts: 19,545
Likes: 7
Traveler
Online Content
Traveler
Joined: Mar 2009
Posts: 19,545
Likes: 7
But will it be able to service and keep up with all the new development plans?

Joined: Oct 2013
Posts: 1,821
Likes: 2
bdeeley Offline OP
Traveler
OP Offline
Traveler
Joined: Oct 2013
Posts: 1,821
Likes: 2
GEBE has not posted any load shedding notices in the past week! Maybe bringing Engine #19 back online has solved their problems in the short term! These improvements don't even include the completed installation of the new 20 Megawatt units that should be brought online this month. Good news for Dutch side residents and visitors.


Be Happy! Simply because you deserve to be. 😁
Joined: Jan 2018
Posts: 408
U
Traveler
Offline
Traveler
U
Joined: Jan 2018
Posts: 408
There was load shedding in Simpson Bay yesterday, although no schedule was posted


Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5