Traveltalkonline.com Forums

.


SXM Cruise Schedule TTOL Sponsors SXM Travel Calendar
Forum Statistics
Forums39
Topics40,262
Posts326,463
Members26,828
Most Online4,031
Dec 15th, 2024
Top Posters(30 Days)
RonDon 71
jazzgal 31
fabila 30
taraavo 21
Member Spotlight
sxmmartini
sxmmartini
Vermont, North Carolina
Posts: 7,664
Joined: April 2005
Today's Birthdays
Momospill, sas58
Who's Online Now
4 members (KirkB, 3 invisible), 410 guests, and 60 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Aug 2000
Posts: 84,601
Likes: 38
Traveler
OP Offline
Traveler
Joined: Aug 2000
Posts: 84,601
Likes: 38
Jeff Berger's most recent newsletter reports that Royal Palm possibly won't be reopening until 2021?? Really???


Carol Hill
SXM Sponsors
.
Joined: Mar 2009
Posts: 20,012
Likes: 36
Traveler
Offline
Traveler
Joined: Mar 2009
Posts: 20,012
Likes: 36
Think he's wrong. Diamond is saying May 2020 for Royal Palm and July 2020 for Flamingo. All stated in a email I received for Diamond. I would think Diamond would know more than his hearsay.

Joined: Aug 2000
Posts: 84,601
Likes: 38
Traveler
OP Offline
Traveler
Joined: Aug 2000
Posts: 84,601
Likes: 38
I don't know. He claims his sources are with Royal Palm in SXM. 2020 is ridiculous, let alone 2021..


Carol Hill
Joined: Mar 2009
Posts: 20,012
Likes: 36
Traveler
Offline
Traveler
Joined: Mar 2009
Posts: 20,012
Likes: 36
Don't know about that. Newsletter I read was just a link he put on to the email Diamod put out stating the same dates I did. Other than promoting skymed all his newsletters are just a composition of Daily Harold news articles and other news articles available to anyone on Google.

Joined: Jan 2003
Posts: 864
Likes: 4
Traveler
Offline
Traveler
Joined: Jan 2003
Posts: 864
Likes: 4
Sitting here on my balcony at Simpson Bay Resort, Beaumontia building, over looking the Flamingo, there are a dozen or so workers visible all day long. They don't appear to be working very hard, but then I'm no contractor. Looks like there is a LOT of work to be done. In buildings 4 & 4 you can see they have been stripped clean inside and most windows and door-walls are gone. At Royal Palm you can see straight through all units and I have never seen more than a couple of workers around.

Joined: Mar 2009
Posts: 20,012
Likes: 36
Traveler
Offline
Traveler
Joined: Mar 2009
Posts: 20,012
Likes: 36
That is a different report that was just posted on another site. Lot's of activity at the Flamingo. Here is the post:
"I drove by Flamingo about an hour ago. LOTS of hard hats about. Still a demolition slide present from the top floor of Bldg 7. And a HUGE crane in the parking lot by the tennis courts. As well as MANY heavy trucks in the drive. So SOMETHING is happening....."

Joined: Aug 2000
Posts: 84,601
Likes: 38
Traveler
OP Offline
Traveler
Joined: Aug 2000
Posts: 84,601
Likes: 38
I got this thing from Jeff Berger this morning, like a special newsletter. I have no idea what's going on with Diamond, but something is, particularly with regard to Royal Palm. That building should be a relatively easy fix. It's ONE building, one roof, not even that big a building, in the scheme of things. And consistently, no one ever sees anyone working there, or hardly anyone.


Carol Hill
Joined: Apr 2001
Posts: 1,562
Traveler
Offline
Traveler
Joined: Apr 2001
Posts: 1,562
I’d bet money that the original building didn’t take anywhere near 4 years to build!


Rick and Grace
Joined: Jan 2003
Posts: 864
Likes: 4
Traveler
Offline
Traveler
Joined: Jan 2003
Posts: 864
Likes: 4
I counted hard hats mid morning and got to 16. Yes there is a crane but it doesn't appear to be doing anything. There are many more workers and trucks at LaVista. For the size of Flamingo, they need a WHOLE lot more activity!

Last edited by Leagle49; 12/06/2018 04:55 PM.
Joined: Mar 2009
Posts: 20,012
Likes: 36
Traveler
Offline
Traveler
Joined: Mar 2009
Posts: 20,012
Likes: 36
Here is another post from a recent observer:
"You may not see much from the outside but on the inside they will have to build every adjoining wall with concrete cinder blocks ,between each and every unit , the old walls were blown right through. This will make the units stronger and less susceptible to future damage , it take time and planning to gut and redo plumbing and electric the right way , when it's finished it will be the gem of the Caribbean 👍"
It's a lot bigger job to do reconstruction than it is to start from ground level. Plus they still need to have all the special order counters etc to be made and shipped in.

Joined: Mar 2001
Posts: 18,147
Likes: 20
Traveler
Offline
Traveler
Joined: Mar 2001
Posts: 18,147
Likes: 20
Originally Posted by SXMScubaman
Here is another post from a recent observer:
"You may not see much from the outside but on the inside they will have to build every adjoining wall with concrete cinder blocks ,between each and every unit , the old walls were blown right through. This will make the units stronger and less susceptible to future damage , it take time and planning to gut and redo plumbing and electric the right way , when it's finished it will be the gem of the Caribbean 👍"
It's a lot bigger job to do reconstruction than it is to start from ground level. Plus they still need to have all the special order counters etc to be made and shipped in.

Then why not level the structure and start over?


J.D.
Joined: Aug 2000
Posts: 84,601
Likes: 38
Traveler
OP Offline
Traveler
Joined: Aug 2000
Posts: 84,601
Likes: 38
Agreed, JD. One could bulldoze the whole thing and start over and save time and money.. Scubaman, I guess you want to believe whatever they say, but there is something going on, that doesn't have anything to do with getting the property open as soon as possible.


Carol Hill
Joined: Mar 2009
Posts: 20,012
Likes: 36
Traveler
Offline
Traveler
Joined: Mar 2009
Posts: 20,012
Likes: 36
I can live with it as I have alternatives that are even less costlier till Flamingo opens for our same timeframe. Flamingo will always be my go to place but what we have now works.

Joined: Apr 2005
Posts: 659
Traveler
Offline
Traveler
Joined: Apr 2005
Posts: 659
I am not involved with the reconstruction but typically you don't just go in and add concrete cinder blocks between "each and every unit" because of weight limitations that were not previously designed in the original construction.

Joined: Aug 2000
Posts: 2,666
I
Traveler
Offline
Traveler
I
Joined: Aug 2000
Posts: 2,666
I find it strange that it didn't have cinder interior walls. Our unit at SBYC had cinderblock interior walls and it was built a long time ago.
At least 30 years ago.
Does sound strange.
irina

Joined: Dec 2009
Posts: 148
T
Traveler
Offline
Traveler
T
Joined: Dec 2009
Posts: 148
That is a poured concrete building. The concrete walls are what hold it up. I'm not an engineer, but it sounds preposterous to me to suggest that the walls would need to be "reinforced", never mind whether the structure could withstand the weight. It is simply fanciful to suggest that Royal Palm is dealing with delays related to construction. I bought a week there many years ago, based on my relationship with someone who purchased from the original developer. According to him, the developer cut whatever deals he could with purchasers, including those who purchased 52 weeks. It was basically the Wild West. Between the 52 week owners and the fixed week owners, there are all sorts of financial challenges that an operator faces. And that is what is the holdup here, not "bricks and sticks" issues.


Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5