From an unbiased opinion, how is the resort doing on rebuilding?
|
|
|
.
|
|
|
Joined: Mar 2009
Posts: 19,869 Likes: 26
Traveler
|
Traveler
Joined: Mar 2009
Posts: 19,869 Likes: 26 |
What I saw in May/June from an outside view they are doing a great job. Beach and pool areas looked great. They are now reconstructing the snack shack/bar on the point.
|
|
|
|
Joined: Aug 2000
Posts: 84,383 Likes: 23
Traveler
|
Traveler
Joined: Aug 2000
Posts: 84,383 Likes: 23 |
I could be wrong, but I thought that all buildings that were damaged by the hurricane (EXCEPT! for those that were demolished) have been fully repaired and are operational.
Carol Hill
|
|
|
|
Joined: Mar 2009
Posts: 19,869 Likes: 26
Traveler
|
Traveler
Joined: Mar 2009
Posts: 19,869 Likes: 26 |
|
|
|
|
Joined: Jun 2014
Posts: 228
Traveler
|
Traveler
Joined: Jun 2014
Posts: 228 |
I think that they are still working on A Building and A pool. Everything else is complete and amazing as ever. I was there inJuly.
|
|
|
|
Joined: Dec 2006
Posts: 139
Traveler
|
Traveler
Joined: Dec 2006
Posts: 139 |
I believe they are still putting the finishing touches on the Allamanda ("A") Building. They were planning to have it ready this month.
|
|
|
|
Joined: Dec 2004
Posts: 5,166 Likes: 4
Traveler
|
Traveler
Joined: Dec 2004
Posts: 5,166 Likes: 4 |
We "own" in the upper B building (5th floor) and the 4th and 5th floors of that building we not available for use. I heard, reliable or not, that they would be ready by October/November of this year. Hoping for use for our January trip.
The resort would not commit to a time frame when asked back in April....
Last edited by boucharda; 09/06/2018 02:24 PM.
|
|
|
|
Joined: Jan 2005
Posts: 572
Traveler
|
OP
Traveler
Joined: Jan 2005
Posts: 572 |
What bldg's were demoed and how do the timeshare owners get compensated? If anyone knows.
|
|
|
|
Joined: Dec 2007
Posts: 464
Traveler
|
Traveler
Joined: Dec 2007
Posts: 464 |
The two "C" and "D" buildings were demolished. SBR invoked the "force majeur" (Act of God) clause of the contract which basically released both parties from the contract without recompense. They did however offer the owners a floating "Points" offer if they continued to make maintenance payments for their no-longer existing units. The "Points" could be used at Royal Resorts properties or exchanged in Interval. We lost C11A weeks 8 and 9 and C11B week 8. Our member photo was taken years ago from the C11A unit.
Last edited by jrr1148; 09/07/2018 07:23 AM. Reason: additional info added
|
|
|
|
Joined: Oct 2007
Posts: 180
Traveler
|
Traveler
Joined: Oct 2007
Posts: 180 |
Actually three buildings were demolished, Diffenbachia, Caladium and Croton.
|
|
|
|
|
|