Traveltalkonline.com Forums

.


BVI Cruise Schedule TTOL Sponsors BVI Travel Calendar
Forum Statistics
Forums39
Topics40,254
Posts326,425
Members26,825
Most Online4,031
Dec 15th, 2024
Top Posters(30 Days)
RonDon 81
jazzgal 34
fabila 30
taraavo 22
Member Spotlight
jazzgal
jazzgal
Portland, OR
Posts: 5,187
Joined: June 2009
Today's Birthdays
amurphy08, diver130
Who's Online Now
1 members (Scotia), 359 guests, and 62 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#138965 08/28/2017 09:40 AM
Joined: May 2004
Posts: 850
calsail Offline OP
Traveler
OP Offline
Traveler
Joined: May 2004
Posts: 850
The web-cam at Leverick Bay is giving us a nice view of the construction for the new beach, bar, and docks. Just wondering if you, Nick, might post an artist's conception of the project. Can't wait to visit in Feb.

BVI Sponsors
.
Joined: Apr 2014
Posts: 304
Traveler
Offline
Traveler
Joined: Apr 2014
Posts: 304
Quote
calsail said:
Just wondering if you, Nick, might post an artist's conception of the project.


... and a general description of the construction method and materials (the webcam is a little fuzzy). Thanks.

Joined: Dec 2012
Posts: 219
Traveler
Offline
Traveler
Joined: Dec 2012
Posts: 219
Facebook page has the layout

Last edited by Whitesail; 08/28/2017 10:59 AM.
Joined: Nov 2009
Posts: 42
Traveler
Offline
Traveler
Joined: Nov 2009
Posts: 42
Here's the pic from Leverick's FB page, shared on google drive...

https://drive.google.com/file/d/0B-ebuI0NLP3BSDZSb3pyWUdMSWc/view?usp=sharing

Last edited by DavidS; 09/01/2017 09:33 AM.

Dave Swenson
S/V Priscilla
60' Gaff Rigged 1888 Oyster Sloop
Long Island Maritime Museum W. Sayville, N.Y.
Joined: Aug 2006
Posts: 2,028
Traveler
Offline
Traveler
Joined: Aug 2006
Posts: 2,028
Quote
aarpskier said:
[quote]calsail said:
Just wondering if you, Nick, might post an artist's conception of the project.


We are driving the bulkhead down with a water jet and heavy telegraph pole dropped from above. The bulkhead is interlocked. On top of the bulkhead is 3ft cast concrete to stop the structure from popping. Once completed we are back filling with boulders and blinding those off with the broken , tumbled, recycled glass that Julie has started doing in the valley. Ontop of the glass goes the sand.
We are also diving the whole area before we start backfilling to relocate all living things on the sea bed including numourous star fish and conch. You are all going to love pulling up a seat or lounger and watch Leverick as its never been before.
Project next year, build new bar on the waterfront <img src="http://www.traveltalkonline.com/forums/images/graemlins/Clapping.gif" alt="" /> <img src="http://www.traveltalkonline.com/forums/images/graemlins/Clapping.gif" alt="" />


Nick Willis
"Mine Host"
Leverick Bay Resort & Marina
NickR #138970 09/02/2017 12:01 PM
Joined: Apr 2014
Posts: 304
Traveler
Offline
Traveler
Joined: Apr 2014
Posts: 304
Nick: Thanks for the construction means and methods description. With the plan diagram, watching the web cam activity now makes a lot more sense.


Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5