Traveltalkonline.com Forums

.


SXM Cruise Schedule TTOL Sponsors SXM Travel Calendar
Forum Statistics
Forums39
Topics39,564
Posts320,874
Members26,686
Most Online4,031
Dec 15th, 2024
Top Posters(30 Days)
jazzgal 44
RonDon 35
GaKaye 24
Kennys 21
Member Spotlight
islandgem
islandgem
Ottawa, Ontario, Canada
Posts: 13,197
Joined: January 2008
Today's Birthdays
SteveCrane
Who's Online Now
22 members (Todd, MrEZgoin, BillDauterive, bostonbob, MGA, Zanshin, Kennys, alecu7, SXMBND, JandIrene, xrayman67, SXMScubaman, knitsoftwear, CLIFFTOPS, CaribbeanCanadians, mark37, Whale Tail, Don_and_Linda, Alltech63, eightzerobits, SXMbeacher, 1 invisible), 1,712 guests, and 90 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#220508 03/13/2020 07:19 AM
Joined: Feb 2001
Posts: 880
marge Offline OP
Traveler
OP Offline
Traveler
Joined: Feb 2001
Posts: 880
Been here for the last 4 weeks, in the front B building.
Good news for Flamingo “owners”. Work on the Flamingo the first week consisted of 8-10 men mostly milling around. Second week work was done on AC unit’s on roofs. Third week someone must have told them that the expected date to open was this year. Still would be amazed if they are ready much before September.
Bad news for SBR “owners”, Very active work site 6 days a week with drilling and grinding starting at 7 am, ending around 3:30pm. LOUD. More intrusive than Roxy’s music, for sure! More reason to go offsite for the day, so we are off to Friars!


marge
SXM Sponsors
.
Joined: Sep 2006
Posts: 50
Traveler
Offline
Traveler
Joined: Sep 2006
Posts: 50
Personally I view that as good news for SBR owners; such as myself. Perhaps not so good news for current guests.....

Joined: Mar 2009
Posts: 19,484
Likes: 4
Traveler
Online Content
Traveler
Joined: Mar 2009
Posts: 19,484
Likes: 4
Target date is August for opening. I understand there is a lot of work being done on the interior that is not observed by people not inside.

Joined: Nov 2017
Posts: 195
W
WLE Offline
Traveler
Offline
Traveler
W
Joined: Nov 2017
Posts: 195
Marge, Here at the villas Roxxy is much worse than the contruction, Loud boom-boon, not even music, starts about noon and goes until at least midnight.
There have been alot of complaints to management here, but they don't seem to be able to get any results. I have been here watching the
slow progress at the Flamingo for over for two months and walking all the way around the buildings several times and never heard one fifth
the amount of the noise that comes from Roxxy.

Joined: Mar 2009
Posts: 19,484
Likes: 4
Traveler
Online Content
Traveler
Joined: Mar 2009
Posts: 19,484
Likes: 4
I wouldn't think there should be as much as all the heavy jack hammering and tile removal has been completed. Inside plumbing, wiring, wall finishing, electrical etc doesn't generate to much audible sound. There is still some exterior grinding and finishing being done which does create noise. End results will be good.

Joined: Aug 2000
Posts: 83,992
Likes: 4
Traveler
Offline
Traveler
Joined: Aug 2000
Posts: 83,992
Likes: 4
Scubaman--marge is there, so if she says there is drilling and grinding, I would be inclined to think there is..


Carol Hill
Joined: Mar 2009
Posts: 19,484
Likes: 4
Traveler
Online Content
Traveler
Joined: Mar 2009
Posts: 19,484
Likes: 4
You must have missed what I stated in my post. Exterior grinding and finishing is being done on the walls of building 7 which is next to SBR.

Joined: Aug 2000
Posts: 83,992
Likes: 4
Traveler
Offline
Traveler
Joined: Aug 2000
Posts: 83,992
Likes: 4
ok


Carol Hill
Joined: Dec 2004
Posts: 5,123
Likes: 2
Traveler
Offline
Traveler
Joined: Dec 2004
Posts: 5,123
Likes: 2
"bad for SBR" sounds like a created issue involving SBR that will have to be tolerated for some time rather than a temporary work issue that will end. Agree...those are there now..well..it sucks..but it will not last forever

Joined: Mar 2012
Posts: 246
B
Traveler
Offline
Traveler
B
Joined: Mar 2012
Posts: 246
Originally Posted by WLE
Marge, Here at the villas Roxxy is much worse than the contruction, Loud boom-boon, not even music, starts about noon and goes until at least midnight.
There have been alot of complaints to management here, but they don't seem to be able to get any results. I have been here watching the
slow progress at the Flamingo for over for two months and walking all the way around the buildings several times and never heard one fifth
the amount of the noise that comes from Roxxy.

Totally agree. The noise from Roxxy is horrible at the Villas.

Joined: Feb 2005
Posts: 867
Likes: 1
Traveler
Offline
Traveler
Joined: Feb 2005
Posts: 867
Likes: 1
I really didn't see what the draw was to Roxy's.? The music I heard while walking by,,was bad...but I am so surprised, when we stayed above the Greenhouse,,and acutally could see Roxy's that banging booming music was not heard on our outside living areas?? Doesnt make sense to me. We were outside a lot even in the evening and never heard anything other than music from Buccanneer and it was not overwhelming at all. Must just be the way sound travels. Just an observation. I feel bad if people in the villas at sbr have to listen to that booming every night....someone should be able to do something about that. We popped into Roxy's on way back from dinner one night...sure was not a welcoming feeling, and besides,,,wouldnt have stayed anyways....definitely a "certain" crowd . We didn't seem to click, lol. How in the world will people staying at the Royal Palm when it re-opens be able to tolerate it? Wow


Randy and Meg Young
Joined: Feb 2001
Posts: 880
marge Offline OP
Traveler
OP Offline
Traveler
Joined: Feb 2001
Posts: 880
Well, you can see into building 4 and 7, and there is no interior work being done. Doors and windows are in, but from a good view from the A. Building here, materials, but no workers. Wall boards are lying on floor, nothing on wall but studs. AC on roofs generating the drilling into concrete slabs, and jackhammering and grinding from units on the beach. A bit of exterior work being done. To make August timeline, they would have to add at least 3 times more workers.
As a SBR member, I wish Flamingo the best of luck, as I appreciate early morning peace and quiet.


marge
Joined: Aug 2000
Posts: 83,992
Likes: 4
Traveler
Offline
Traveler
Joined: Aug 2000
Posts: 83,992
Likes: 4
marge--it will be interesting to see what happens with it. I thought the timeline from Diamond was that they planned to receive back the property from the construction around August and then ready it for occupation after that, with a very fuzzy timeline as to how long it would take after they receive back the property. So, not putting any furniture or furnishings etc., in till after August? Just stocking the units will take quite some time, I would think. Regardless, I doubt it will happen by then.

Regarding the noise from Roxxy, the electronic music festival is over this weekend, I think, so maybe the noise will calm down then. Noise has a weird way of traveling. We often hear bass from SOMEWHERE down toward Karakter or beyond, way down at Beachside Villas.


Carol Hill
Joined: Mar 2009
Posts: 19,484
Likes: 4
Traveler
Online Content
Traveler
Joined: Mar 2009
Posts: 19,484
Likes: 4
Timeline to receive building back from contractors was always end of June first of July and then start stocking with furniture etc for August occupancy. But that is if all goes as scheduled.

Joined: Feb 2001
Posts: 880
marge Offline OP
Traveler
OP Offline
Traveler
Joined: Feb 2001
Posts: 880
If the contractors are finished by June, I want to hire them to do my bathroom.They must be great.


marge
Joined: Mar 2009
Posts: 19,484
Likes: 4
Traveler
Online Content
Traveler
Joined: Mar 2009
Posts: 19,484
Likes: 4
They have over 200 workers split between the 2 resorts. Not out of the question that they could get it done in time. Not much work gets done on Saturdays or Sundays which could be the reason you or another poster didn't notice many workers today.

Joined: Mar 2001
Posts: 17,843
Likes: 2
Traveler
Offline
Traveler
Joined: Mar 2001
Posts: 17,843
Likes: 2
From the number of cars parked near the two resorts in question, there appears to be a lot of workers but I have no idea on what progress they are making. I saw a lot of them walking in the vicinity of Flamingo last night around 6:00pm. They must have just gotten off work. Personally, I would not bet on either resort being open for some time yet, especially Royal Palm.


J.D.
Joined: Mar 2009
Posts: 19,484
Likes: 4
Traveler
Online Content
Traveler
Joined: Mar 2009
Posts: 19,484
Likes: 4
A lot of workers stay on Flamingo property in the special housing they put up to accommodate about 200. Some are bused from there to the Royal Palm.


Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5