Traveltalkonline.com Forums

.


SXM Cruise Schedule TTOL Sponsors SXM Travel Calendar
Forum Statistics
Forums39
Topics40,283
Posts326,670
Members26,831
Most Online4,031
Dec 15th, 2024
Top Posters(30 Days)
RonDon 42
fabila 29
jazzgal 18
Manpot 15
Member Spotlight
Posts: 51
Joined: October 2011
Today's Birthdays
jeverny, JimE
Who's Online Now
5 members (GeorgeC1, polaris, connie, 2 invisible), 376 guests, and 61 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Nov 2004
Posts: 91
R
Traveler
OP Offline
Traveler
R
Joined: Nov 2004
Posts: 91
The walls are going up at Cocoa Beach; earlier this week, some interior block work, but most of this week, the guys are working on concrete forms to pour the outer wall. cf. pics attached

There's work going on at the carbet site, but it's a bigger site and there is nothing different to pick up with a picture. Most of this week, they seem to be leveling the site and using a compacter to bang down the soil that they had shifted to put in the underpinnings.


OOPS. sorry about the one pic orientation!

Attached Images
IMG_6079.JPG IMG_6080.JPG IMG_6081.JPG IMG_6082.JPG IMG_6083.JPG
Last edited by RunnernReader; 03/08/2019 11:48 AM.
SXM Sponsors
.
Joined: Aug 2000
Posts: 84,631
Likes: 38
Traveler
Offline
Traveler
Joined: Aug 2000
Posts: 84,631
Likes: 38
Thanks for the update. That one picture sure illustrates better how the structure is built back almost into that hill. I guess that will provide some protection from winds from behind.


Carol Hill

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5