...or so says the Daily Herald, anyway.
Daily Herald storyI could be wrong, often am, but I don't see that the carbets will be open this high season, except the one next to the end closest to where Club O was.
This is that building, photo taken on October 5, 2019. Interesting that the picture in the DH is old, because the building is not painted in the DH picture
![[Linked Image]](http://www.traveltalkonline.com/gallery/40/full/4206.jpg)
Of the other units, they have only even started any construction on I believe 4 of them. Here are some pictures of the area. I believe two of the four under construction are Chez Leandra and Orange Fever.
![[Linked Image]](http://www.traveltalkonline.com/gallery/40/full/4207.jpg)
![[Linked Image]](http://www.traveltalkonline.com/gallery/40/full/4208.jpg)
![[Linked Image]](http://www.traveltalkonline.com/gallery/40/full/4209.jpg)
![[Linked Image]](http://www.traveltalkonline.com/gallery/40/full/4210.jpg)
Oh and if you take a look at the picture of the bathroom in one of the shots, there is a big hole in the side of the roof. And there was garbage piled in the bathroom. Something could have changed since we took those pictures, but somehow, I don't think that the bathrooms are quite ready to go...